manufactured steel buildings and prefab metal buildings ISO9001 expertly cut

Model: 1-551
Place of Origin: Shandong,China (Mainland)
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil
Surface Treatment: painted with PPG painted with international paint
Software used: AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures( Xsteel )V12.0.etc
Shipment by: Container or bulk ship
Design& quote: We can make design and quotation according to your require or your drawing

inquiry

basketAdd to Basket  Edit

Share |

Product Description

Payment & Shipping Terms Supply Capacity
Unit Price:1000.0 USDProduction Capacity:8000 Ton/per Month
Trade Term:FOBPacking:Bolts and accessories...
Payment Terms:L/CDelivery Date:15 to 40 days
Min. Order:50 Metric Ton
Means of Transport:Ocean

1. Characteristics for the manufactured steel buildings ( made of steel frame ) :

1 ) Wide span : single span or multiple spans , the max span is 36m without middle column .

2 ) Low cost : Unit price range from USD35 / m2 to USD70 / m2 according to customers' request .

3 ) Fast construction and easy installation .

4 ) Long using life : up to 50 years .

5 ) Easy construction , time-saving , and labor saving 
6 ) Flexible layout , beautiful appearances , and higher space efficiency 
7 ) Be used as warehouses , workshops , shopping mall , dinning hall , stadium , etc .

8 ) Others : environmental protection , stable structure , earthquake proofing , water proofing , and energy conserving .

 

2. About our company:

1) We have a group of professional engineers, most of whom has more than 10 years' experiences in architecture field.

2) Established for more than ten years, our company has got a various of experiences in all kinds of steel structure& steel building design, manufacture, installation and so on. The work staffs have excellent skills. Some of them had helped customers to install the warehouse around the world.

3) We have the capacity of annually 200,000 tons steel structure. We also have possessed more than 300 sets of large precise and advanced processing equipment, including large gantry planning machines, automatic submerged arc welding machines, assembling machines, shot blasting machines and so on.

 

3. Market covered:

Euro-market: German, England, French, Russia, Georgia

The American market: USA, Canada, Venezuela

Oceania market: Australia, New Zealand, Samoa

The Africa market: Angola, Algeria, Ghana

 

4. Design & Engineering strength on manufactured steel buildings ( made of steel frame ) :

The engineering work in structural steel design includes in-depth analysis and design of the complete structure, in addition to the preparation of construction drawings and shop details.

1) We are an ISO 9001 certified company by UL Inc. USA, for design and manufacture of Pre-Engineered Steel Building Systems and Structures.

2) Our structural design team of 100 dedicated professionals and senior structural designers, is well equipped to work in accordance with all Chinese and international codes.

3) State-of-art technology is used for detailed design which is at par with international building design standards. All our steel buildings are designed using the most advanced metal building soft wares like Staad Pro, MBS, Tekla and others.

 

 

5. Our seaworthy packing system for manufactured steel buildings ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Q: How could I control the cost of building a manufactured steel buildings ( made of steel frame ) ?

A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.

 

2) Q: How Long does it take to build a manufactured steel buildings ( made of steel frame ) ?

A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.

 

3) Q: Is it difficult to build a manufactured steel buildings ( made of steel frame ) ?

A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.

 

 


Category: prefab metal buildings

Related Category: pre engineered metal buildings  custom metal buildings  metal building structure 


«